6019 GHANA OCTP DEVELOPMENT PROJECT
This oil and gas project consisted of the following;
- Design and construction of the shore approach including site preparation, trenching, rock dumping and reinstatement.
- Supply and Installation of 26″ diameter steel pipeline.
- Design, fabrication and installation of PLET/ILT and 22” diameter spool piece.
- Supply and Installation of 18” diameter HDPE pipeline to convey raw water for operations by ENI at the offshore site. ·
- Pre-commissioning of Pipeline systems, including dewatering, drying, and nitrogen purging.